网站首页
上海龙凤419
阿拉爱上海
上海龙凤419
阿拉爱上海
Wireless Tracks: How Shanghai Is Reinventing Urban Mobility Without Expanding Subway Lines
SECTION 1: THE INFRASTRUCTURE PARADOX1.1 Subway Saturation• Metro Line 2 peak hour congestion at 142% capacity• Construction cost per km rising to $150 million• Last-mile connectivity challenges1.2 Digital Overhaul- AI traffic management syst
⏱ 2025-05-22 00:04
🔖
阿拉爱上海
📢 0 ℃